Tuhin Shubhra Adhikary | The Daily Star
  • Tuhin Shubhra Adhikary

  • Padma Bridge Rail Link: 2 ministers downplay design flaw of viaduct

    With the cabinet division having already directed Padma Bridge Rail Link Project (PBRLP) authority to redesign viaducts due to the poor vertical and horizontal clearance, the railways minister, who visited the site along with planning minister yesterday, tried to down play the problem.
  • Khulna-Darshana Double Rail Track: Half of project period gone for nothing

    Two and a half years ago, the government had approved a project to build a double rail line along the existing single track from Khulna to Darshana.
  • Brace yourself for second wave

    With infections and deaths from Covid-19 still far from over, a high-powered technical committee has warned that a “second wave” of coronavirus infections may be coming, advising the government to prepare a roadmap and take all-out preparations to prevent the possible resurgence.
  • A rare and welcome instance

    Authorities of a project under the Roads and Highways Department (RHD) have proposed building 10 more bridges under their ongoing-project as they were able to save Tk 286 crore so far.
  • Padma Bridge Rail Route

    Padma Bridge Rail Link: Tweak rail design to let tall vehicles pass

    In a major setback, Padma Bridge Rail Link Project authorities have been asked to change its viaduct designs as the poor clearance of bridges would impede large lorries on approach roads.
Top